Programmes: scoping a portfolio, building by building, to a deadline
A renovation programme is a queue of buildings with dates attached. AI Renovation runs that queue: Capture Sets in, Scope Packs out, in the order the deadlines demand.
Social landlords
France has 5.4 million social rental dwellings, 84% of them in collective buildings. Units rated G lost rental eligibility in 2025 and F-rated units follow in 2028, so every landlord holds a list of buildings with a date on each. A programme on AI Renovation takes that list, schedules Capture Sets by deadline, and returns a tender-ready Scope Pack per building within 48 hours of each upload. The Trade Lot Takeoff uses your unit-rate library, so the priced schedule matches how your framework contractors quote.
Co-ownership managers
More than 530,000 co-owned buildings are registered nationally with their managing agent, building-level energy diagnostics became mandatory for all of them between 2024 and 2026, and deep-retrofit subsidies require a priced works programme voted by the general assembly. The Retrofit Frontier gives the assembly the choice it needs: three or four bundles with cost per lot, energy class, and carbon, all computed on the measured building. The Scope Pack becomes the tender.
Tertiary owners and facility managers
Buildings above 1,000 m2 must reduce energy use by 40% by 2030 under the tertiary decree and report on a public platform every year. For a portfolio of offices, schools, or clinics, the question is which works reach the target at the lowest cost per square metre and in which order. A programme scopes the portfolio on one queue, with one unit-rate library and one export format, so the capital plan is built on comparable numbers.
How a programme runs
- 01 Onboarding
Your unit-rate library, your trade-lot structure, your export templates, and your deadlines are loaded once.
- 02 Capture
Your surveyor or a partner scanning firm captures each building; the Capture Ledger accepts stations as they arrive and reports registration residuals the same day.
- 03 Scheduling
The Run Scheduler orders Reconstruction Runs by your deadlines and keeps the 48-hour turnaround per building.
- 04 Delivery
Scope Packs export as PDF, CSV, and IFC, or through the API into your asset management system.
- 05 Quality
A quarterly report shows registration residual, element label agreement, and takeoff deviation on your buildings against the commitments.
Procurement
Programmes are contracted per building at the programme rate on the pricing page, with a minimum of ten buildings per year. Public owners can contract through a framework agreement; the service description and the accuracy commitments are written to be attached to a consultation as is.
Apply as design partner